Search This Blog

Friday, November 7, 2014

"Process All ROIs as single TACs" instructions:
a) In Layer Control dialog, select the main 4D Volume to be active, not one of ROIs.  This way all ROIs are considered "equal" and would be
processed in the same fashion.
b) Only Enabled ROIs would be processed.  (Enable\Disable layers by pressing the transparency button next to their name in the Layer Control Dialog.